Our Projects

Take a look at our project portfolio

5-Star Midwest Bath Remodeling

Rated 5 out of 5

Home » Our Projects

Serving Ohio, Michigan, Indiana, Pennsylvania, Wisconsin & Minnesota

We have completed exceptional bathroom remodels all across OH, MI, IN, and PA – take a look at our project map below!

Other Remodeling Services

Baths R Us Installer Checklist

This checklist is designed to ensure every installation is completed with the highest standards of professionalism, safety, and customer satisfaction. Follow each step carefully to streamline your workflow, minimize errors, and deliver an exceptional experience for every homeowner.

Checklist Header Image

1. Warehouse

  • Arrive at the warehouse by your scheduled time (7AM or 8AM).
  • Review your job packet and confirm the project timeline.
  • Ensure you have all required materials and supplements like butyl tape, primer, etc.
  • If late (after 10AM), call the homeowner with your ETA.

2. Jobsite Arrival

  • Head Installer: Confirm parking, check for leaks, greet the homeowner, review the scope, collect payment or signatures.
  • Apprentice: Set up the yard sign, booties, and drop cloths, begin unloading tools.
Jobsite Arrival

3. Before Demolition

  • Inspect for fragile items; ask homeowner to remove them or sign waiver.
  • Take photos: wet space, bathroom, vanity, existing damage.
  • Verify material sizes before demolition.

4. During Demolition

  • Cover all surfaces with drop cloths; use plastic and tape if needed.
  • Be cautious with debris removal.
  • Turn off main water supply.

5. During Installation

  • Don’t notch joists — contact manager for help.
  • Level and protect base, clean and template walls.
  • Use proper adhesive and dry fit panels before installing.
  • Ask homeowner where to place accessories.
Installation Process

6. After Installation is Complete

  • Clean the bathroom completely.
  • Walk through with the homeowner. Note pending services.
  • Get a signed completion form and a 5-star review.
  • Discuss care instructions and mold treatment timing.
  • Take final photos and send to Amanda.

7. Communication

  • Always be respectful and professional.
  • Report issues to the manager discreetly.
  • Never criticize the homeowner’s decisions.
  • Keep your manager updated on progress.

8. Appearance & Etiquette

  • Wear clean clothes and maintain hygiene.
  • No smoking or offensive language onsite.

Client Project: Mr. & Ms. Williams’s Master Bathroom Retreat

When Mr. & Ms. Williams reached out to Baths R Us, they weren’t just looking to refresh their bathroom—they were dreaming of a complete transformation. Their original master bathroom was cramped, outdated, and disconnected from the elegance of their bedroom. What they envisioned was a peaceful, luxurious retreat that blended modern design, technology, and comfort.

From our very first meeting, it was clear they had a strong vision, and we made it our mission to bring that to life with care, professionalism, and precision.

Step 1: Vision & Planning

Our process began with a detailed consultation, where we listened carefully to Mr. & Ms. Williams’ goals, preferences, and priorities. Their vision included:

  • A freestanding acrylic soaking tub placed under the bathroom window
  • A frameless walk-in shower with a handheld wand
  • Dual floating vanities with ample storage
  • A large, backlit LED mirror with anti-fog technology
  • Heated marble-look porcelain tile flooring

Equally important to them was completing the entire remodel in six working days and staying within a fixed budget.

We reviewed layout options, selected materials and fixtures, and finalized a daily schedule to ensure seamless execution. By the end of the planning stage, every detail had been locked in with full transparency.

Step 2: Demolition

Our crew arrived promptly on Day 1, fully prepped and respectful of the Williams’ home. Protective coverings, drop cloths, plastic barriers, and booties were used throughout to ensure cleanliness and care.

We walked through the project one final time with the homeowners to verify all measurements and placement. Once confirmed, we removed the outdated fiberglass tub, worn vanity, dated tile, and fixtures—all in a single day with no disruption to the rest of the home.

Step 3: Installation & Transformation

With demolition complete, we began the transformation. Over the following five days, the space was rebuilt from the ground up using high-end materials and smart design elements.

  • Flooring: Durable and stylish flooring was selected to provide a clean, cohesive foundation for the space.
  • Tub: A freestanding acrylic soaking tub was positioned perfectly under the window, paired with a matte black floor-mounted tub filler.
  • Shower: The new curbless walk-in shower featured frameless glass, white subway tile, a built-in niche, and dual matte black fixtures including a rainfall and handheld showerhead.
  • Vanities: Two floating vanities with quartz countertops and soft-close drawers were installed, finished with motion-activated under-cabinet lighting.
  • Mirror: A single oversized LED mirror with anti-fog and touch lighting controls served as a modern centerpiece.

Throughout the installation, our team maintained daily communication with the homeowners, confirmed preferences as we went, and adapted seamlessly to any minor updates or requests.

Step 4: Final Walkthrough & Reveal

On the sixth and final day, we conducted a deep clean and a full walkthrough with Mr. & Ms. Williams. The bathroom was completed on time, on budget, and exactly as planned—with no delays or change orders.

We demonstrated the new lighting system, reviewed care instructions, and answered all remaining questions. The Williams signed off on the completion and generously shared a 5-star review of their experience.

They were especially thrilled with the mirror’s soft glow at night, the spa-like ambiance of the shower, and the serene placement of their new tub—now their favorite place to unwind.

Project Journey Overview

Phase Key Actions & Deliverables
Vision & Planning Detailed consultation, material selection, layout design, budget and timeline agreement
Demolition Full removal of outdated fixtures, tiles, and plumbing within one day
Installation New tub and shower system, dual vanities, LED mirror
Final Walkthrough & Reveal Cleaning, system demos, walkthrough with client, completion form signed
Outcome Project completed on time and within budget

Project Summary

Clients: Mr. & Ms. Williams
Location: Cleveland
Scope: Full bathroom remodel connected to master bedroom
Timeline: 6 working days (May 5–May 10, 2025)
Budget: Delivered 100% within original estimate

Testimonial

“From day one, they listened, respected our budget, and brought our vision to life. The team was polite, clean, and always on time—and our new bathroom feels like a personal spa. We couldn’t be happier.”
— Mr. & Ms. Williams

Mr. & Ms. Williams’ bathroom now functions as a true sanctuary—an elegant, tech-integrated, and practical extension of their living space. We are proud to have helped bring their vision to life with precision and pride.

Ready for Your Own Transformation?

Whether you're dreaming of a modern spa ensuite or simply want a fresh, elegant upgrade—Baths R Us delivers results that reflect your lifestyle, taste, and needs. Let’s build your story next.

By clicking this “get quote”, I consent to receive autodialed and/or prerecorded calls, text messages, and emails from Baths R Us to verify my contact information, provide information about my account and/or purchases, and/or advertise its products and services, at the phone number provided above, including my wireless number if provided, even if my number is currently listed on any state, federal or internal Do Not Call list. I understand that consent is not a condition of purchase, and I can instead call 855-592-2284 to arrange for a free estimate. I understand that I may revoke this consent at any time by contacting Baths R Us at [email protected].

Popular Searches